What we deliver
Asphalt Contracting
Dense-graded, open-graded and heavy-duty mixes, from overlays to full-depth reconstruction.
The short version
Asphalt is unforgiving about temperature and timing. Mat thickness, delivery temperature and the rolling pattern decide whether a surface lasts fifteen years or five, and none of them can be corrected afterwards.
01What we control
Mix chosen for the layer and the traffic
Wearing course, intermediate course and heavy-duty mixes are specified against what runs over them, not against what is cheapest to cart.
Joints planned before the first truck
A cold joint is the first thing to fail on any asphalt job. Where the joints fall is decided at the staging stage, not on the day.
Compaction inside the window
Density is won in the minutes between the screed and the mat going cold. Thin mats on cold days give you very few of them.
Recycled and warm-mix options
Recycled asphalt pavement, warm mix and crumb rubber binders wherever the specification and the asset owner allow them.